年月 | 单位:千元 |
含“(E)”其对应值为系统预测,仅供参考。 | |
2025-10(E) | 购买后可见 » |
2025-09(E) | 购买后可见 » |
2025-08(E) | 购买后可见 » |
2025-07(E) | 购买后可见 » |
2025-06(E) | 购买后可见 » |
2025-05(E) | 购买后可见 » |
2025-04(E) | 购买后可见 » |
2025-03(E) | 购买后可见 » |
2025-02(E) | 购买后可见 » |
2025-01(E) | 购买后可见 » |
2024-12(E) | 购买后可见 » |
2024-11(E) | 购买后可见 » |
2024-10 | 购买后可见 » |
2024-09 | 购买后可见 » |
2024-08 | 购买后可见 » |
2024-07 | 购买后可见 » |
2024-06 | 购买后可见 » |
2024-05 | 购买后可见 » |
2024-04 | 购买后可见 » |
2024-03 | 购买后可见 » |
2024-02 | 购买后可见 » |
2023-12 | 购买后可见 » |
2023-11 | 购买后可见 » |
2023-10 | 购买后可见 » |
2023-09 | 购买后可见 » |
2023-08 | 购买后可见 » |
2023-07 | 购买后可见 » |
2023-06 | 购买后可见 » |
2023-05 | 购买后可见 » |
2023-04 | 购买后可见 » |
2023-03 | 购买后可见 » |
2023-02 | 购买后可见 » |
2022-12 | 购买后可见 » |
2022-11 | 购买后可见 » |
2022-10 | 购买后可见 » |
2022-09 | 购买后可见 » |
2022-08 | 购买后可见 » |
2022-07 | 购买后可见 » |
2022-06 | 购买后可见 » |
2022-05 | 购买后可见 » |
2022-04 | 购买后可见 » |
2022-03 | 购买后可见 » |
2022-02 | 购买后可见 » |
2021-12 | 购买后可见 » |
2021-11 | 购买后可见 » |
2021-10 | 购买后可见 » |
2021-09 | 购买后可见 » |
2021-08 | 购买后可见 » |
2021-07 | 购买后可见 » |
2021-06 | 购买后可见 » |
2021-05 | 购买后可见 » |
2021-04 | 购买后可见 » |
2021-03 | 购买后可见 » |
2021-02 | 购买后可见 » |
2020-12 | 购买后可见 » |
2020-11 | 购买后可见 » |
2020-10 | 购买后可见 » |
2020-09 | 购买后可见 » |
2020-08 | 购买后可见 » |
2020-07 | 购买后可见 » |
2020-06 | 购买后可见 » |
2020-05 | 购买后可见 » |
2020-04 | 购买后可见 » |
2020-03 | 购买后可见 » |
2020-02 | 购买后可见 » |
2019-12 | 购买后可见 » |
2019-11 | 购买后可见 » |
2019-10 | 购买后可见 » |
2019-09 | 购买后可见 » |
2019-08 | 购买后可见 » |
2019-07 | 购买后可见 » |
2019-06 | 购买后可见 » |
2019-05 | 购买后可见 » |
2019-04 | 购买后可见 » |
2019-03 | 购买后可见 » |
2019-02 | 购买后可见 » |
2018-12 | 购买后可见 » |
2018-11 | 购买后可见 » |
2018-10 | 购买后可见 » |
2018-09 | 购买后可见 » |
2018-08 | 购买后可见 » |
2018-07 | 购买后可见 » |
2018-06 | 购买后可见 » |
2018-05 | 购买后可见 » |
2018-04 | 购买后可见 » |
2018-03 | 购买后可见 » |
2018-02 | 购买后可见 » |
2017-12 | 购买后可见 » |
2017-11 | 购买后可见 » |
2017-10 | 购买后可见 » |
2017-09 | 购买后可见 » |
2017-08 | 购买后可见 » |
2017-07 | 购买后可见 » |
2017-06 | 购买后可见 » |
2017-05 | 购买后可见 » |
2017-04 | 购买后可见 » |
2017-03 | 购买后可见 » |
2017-02 | 购买后可见 » |
2016-12 | 2562310000.00 |
2016-11 | 2573560000.00 |
2016-10 | 2501820000.00 |
2016-09 | 2472620000.00 |
2016-08 | 2460890000.00 |
2016-07 | 2432790000.00 |
2016-06 | 2432570000.00 |
2016-05 | 2420130000.00 |
2016-04 | 2431190000.00 |
2016-03 | 2420630000.00 |
2016-02 | 2371670000.00 |
2015-12 | 2406230000.00 |
2015-11 | 2429840000.00 |
2015-10 | 2421627309.00 |
2015-09 | 2406943437.00 |
2015-08 | 2374554413.00 |
2015-07 | 2343752883.00 |
2015-06 | 2326894100.00 |
2015-05 | 2309942657.00 |
2015-04 | 2280805309.00 |
2015-03 | 2260058869.00 |
2015-02 | 2216907506.00 |
2014-12 | 2255662898.00 |
2014-11 | 2276109280.00 |
2014-10 | 2254139100.00 |
2014-09 | 2243645240.00 |
2014-08 | 2208712620.00 |
2014-07 | 2208759511.00 |
2014-06 | 2205745068.00 |
2014-05 | 2184312185.00 |
2014-04 | 2152963415.00 |
2014-03 | 2129182003.00 |
2014-02 | 2077206331.00 |
2013-12 | 2024020190.00 |
2013-11 | 2038637425.00 |
2013-10 | 2018842999.00 |
2013-09 | 2002487503.00 |
2013-08 | 1963267390.00 |
2013-07 | 1951598435.00 |
2013-06 | 1909261343.00 |
2013-05 | 1890530123.00 |
2013-04 | 1868720608.00 |
2013-03 | 1815384614.00 |
2013-02 | 1770854833.00 |
2012-12 | 1716526645.00 |
2012-11 | 1719610243.00 |
2012-10 | 1673610106.00 |
2012-09 | 1652453182.00 |
2012-08 | 1638005592.00 |
2012-07 | 1611504916.00 |
2012-06 | 1581020809.00 |
2012-05 | 1553381362.00 |
2012-04 | 1545261863.00 |
2012-03 | 1529205593.00 |
2012-02 | 1461188280.00 |
2011-12 | 1445075987.00 |
2011-11 | 1440547024.00 |
2011-10 | 1417665577.00 |
2011-09 | 1408339385.00 |
2011-08 | 1395161351.00 |
2011-07 | 1362081542.00 |
2011-06 | 1347695205.00 |
2011-05 | 1322189817.00 |
2011-04 | 1298242394.00 |
2011-03 | 1268524454.00 |
2011-02 | 1281482950.00 |
2010-11 | 1216811590.00 |
2010-08 | 1125490896.00 |
2010-05 | 1096910982.00 |
2010-02 | 1001739254.00 |
2009-11 | 983587977.00 |
2009-08 | 909495392.00 |
2009-05 | 849715859.00 |
2009-02 | 791576912.00 |
2008-11 | 788564453.00 |
2008-08 | 785034004.00 |
2008-05 | 748965724.00 |
2008-02 | 677849543.00 |
2007-11 | 660071779.00 |
2007-08 | 626718834.00 |
2007-05 | 599003006.00 |
2007-02 | 537349948.00 |
2006-12 | 532578555.00 |
2006-11 | 538111185.00 |
2006-10 | 527329997.00 |
2006-09 | 517926701.00 |
2006-08 | 506545725.00 |
2006-07 | 493179198.00 |
2006-06 | 485394965.00 |
2006-05 | 478885130.00 |
2006-04 | 458743735.00 |
2006-03 | 437122477.00 |
2006-02 | 420424485.00 |
2005-12 | 408244813.00 |
2005-11 | 404807593.00 |
2005-10 | 397539585.00 |
2005-09 | 394663908.00 |
2005-08 | 388126346.00 |
2005-07 | 383919768.00 |
2005-06 | 375616639.00 |
2005-05 | 370964051.00 |
2005-04 | 362840332.00 |
有色金属冶炼和压延加工业:亏损企业单位数(月)
2000.03 — 2024.10有色金属冶炼和压延加工业:企业单位数(月)
2000.03 — 2024.10有色金属冶炼和压延加工业:资产总计:累计同比(月)
2000.03 — 2024.10有色金属冶炼和压延加工业:管理费用:累计值(月)
2000.03 — 2024.10有色金属冶炼和压延加工业:产品销售费用:累计值(月)
2000.03 — 2024.10有色金属冶炼和压延加工业:应收账款净额:累计同比(月)
2000.03 — 2024.10有色金属冶炼和压延加工业:产品销售税金及附加:累计值(月)
2000.03 — 2015.12有色金属冶炼和压延加工业:产品销售成本:累计值(月)
2000.03 — 2018.12有色金属冶炼和压延加工业:产品销售成本:累计同比(月)
2000.03 — 2018.12有色金属冶炼和压延加工业:产品销售收入:累计值(月)
2000.03 — 2018.12有色金属冶炼和压延加工业:应收账款净额:累计值(月)
2000.03 — 2024.10有色金属冶炼和压延加工业:财务费用:累计同比(月)
2000.03 — 2024.10有色金属冶炼和压延加工业:产成品资金占用率(月)
2000.03 — 2015.10有色金属冶炼和压延加工业:亏损企业亏损总额:累计同比(月)
2000.03 — 2024.10有色金属冶炼和压延加工业:负债合计:累计值(月)
2000.03 — 2024.10有色金属冶炼和压延加工业:管理费用:累计同比(月)
2000.03 — 2024.10有色金属冶炼和压延加工业:工业销售产值(当年价格):累计同比(月)
2003.02 — 2013.02有色金属冶炼和压延加工业:亏损企业数量比例(月)
2000.03 — 2024.10有色金属冶炼和压延加工业:固定资产净值平均余额:累计值(月)
2000.03 — 2007.11有色金属冶炼和压延加工业:产品销售费用:累计同比(月)
2000.03 — 2024.10前瞻产业研究院 咨询·服务